AMCC 9550SX-8LP Manuel d'utilisateur Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
Chapter 2. Installing the Battery Backup Unit
24 3ware 9550SX Serial ATA RAID Controller Quick Install Guide
Tools and equipment required
Slot-head screwdriver
Grounding strap
Battery Backup Unit (BBU) and battery
3ware 9550SX series controller
Installation Overview
The Battery Backup Unit (BBU) is comprised of two pieces: the
battery module and the BBU control module.
These pieces attach to the controller at the points illustrated in
Figures 12 through 13:
a Clips on the battery module match to slots on the half-height
controllers (4-port and 8-port) and holes on the full-height
controllers (12-port and 16-port).
b Connector on the BBU mates to receptacle on the controller.
c Post on the BBU mates to post hole on the controller.
Figure 19. Points of connection on the BBU
a) Clips
b) BBU connector
c) Post
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 39 40

Commentaires sur ces manuels

Pas de commentaire